|
Excel Horizontal Bars come in many sizes to provide the best scaffold fit in any situation. |
|
*Note: Horizontals are designed to be compatible with standard 1.90 OD tube and clamp material. Tubing for PB84, HL96, HL108, HL120, is 1.90 dia. 12 gage, high strength min. 65,000 yield, 75,000 tensile. All other tubing is 13 gage high strength min. 65,000 yield, 75,000 tensile. |
|
Part Number |
Description |
Post Spacing |
Overall Width |
Weight Galvanized (lbs.) |
|
PB24 |
2 Bearer, 2 Plank Bearer |
24 |
22 |
7.9 |
|
PB32 |
32 Bearer, 3 Plank Bearer |
32 |
30 |
8.9 |
|
PB36 |
3 Bearer |
36 |
34 |
9.6 |
|
PB42 |
42 Bearer, 4 Plank Bearer |
42 |
40 |
10.1 |
|
PB48 |
4 Bearer, 5 Plank Bearer |
48 |
46 |
11.4 |
|
PB60 |
5 Bearer, 6 Plank Bearer |
60 |
58 |
12.9 |
|
PB72 |
6 Bearer |
72 |
70 |
15.0 |
|
PB84 |
7 Bearer |
84 |
82 |
18.3 |
|
|
Horizontal Ledgers |
|
|
|
|
HL96 |
8 Ledger |
96 |
94 |
19.0 |
|
HL108 |
9 Ledger |
108 |
106 |
21.0 |
|
HL120 |
10 Ledger |
120 |
118 |
24.0 |