|
Excel Modular Lifting Devices are designed to allow a scaffold to be erected in a safe environment and then hoisted to the actual work location. |
|
Note: 1.) All OSHA and plant safety regulations governing rigging and material handling must be followed. 2.) All loose material must be removed from the scaffold before it is lifted. 3.) Spreader beams must be used so that the lifting load on all vertical posts is applied in an upward direction. 4.) The scaffold must be properly braced to prevent deformation during movement. 5.) Scaffold weight loads must be calculated to prevent the overloading of any scaffold or lifting component. 6.) All scaffold components, (deck boards, etc.) must be secured to the scaffold. |
|
The Lifting Device (LD1) attaches to the top of the vertical post. It is designed to accept a shackle for sling/cable attachment. |

|
The Vertical Pin Support is designed to provide added strength to the vertical post connections. Vertical Locking Clamps must be installed on all vertical posts at the pin connection before lifting the scaffold. |
|
*The snap button must be securely engaged in the vertical post connection. |
|
Part Number |
Description |
Weight (lbs.) |
Maximum Supported Load (lbs.) |
|
LD1 |
Lifting Device |
9.0 |
2400 |
|
VLC |
Vertical Locking Clamp |
9.5 |
2400* |